Testing Procedure
The following testing procedure meets the recommendations of the latest European Standards including IEC62034
Weekly Test
The mains supply is interrupted at the charger/inverter unit. The lamp is checked for minimum light levels after 30 seconds
Annual Duration Test
The mains supply is interrupted at the charger/inverter unit. The lamp is checked for full rated battery duration
Emergency Luminaire Status
The luminaire status is indicated as follows:
Status | LED |
---|---|
System Okay | Green |
Test Underway | Flashing Green |
Lamp Fault | Fast Red |
Charger Fault | Fast Flashing Red |
Battery Fault | Slow Flashing Red |